Maracom has proudly worked throughout the Pandemic supporting the emergency services:

  • NHS
  • HM Prisons
  • Educational establishments
  • Fire Brigade

Maracom again successfully tendered to design and build a mobile package plantrooms, this time to support the Greenwich Peninsula development by the 02 Area.

Maracom moved again to Beckton, East London, taking out a 20 year lease.

Maracom was awarded the contract to replace the boilers at Rowley Way Estate NW8, at the time of being build it was the largest council estate in Europe, in 1993 it was awarded grade II listing which proved all the more difficult for the contract as everything has to be in keeping with the existing such as the flues has to be made to look old.

Maracom also tendered successfully for the contract to design and build 3 no. 2.5mW self-contained plug and play mobile plant rooms to support the energy centre throughout the Olympics, each mobile plant room had to be  fully self-contained; with its own boiler, power generator, oil tank, flexible gas connections and controls.

Maracom moved again to Castle Wharf with facility a much larger workshop to facilitate the business requirements.

After receiving a very strange email asking if we could quote for gas pipe to be installed 50m due north and 75 meters due south with no other information, Maracom was awarded the contract to install the gas pipework to the Olympic Flame, The brief was to design, install, test and maintain the gas pipe work supplying the flame. The design was quite an intricate one as there were numerous hurdles to overcome; the gas pipework route was to run under the staging area (an enclosed space) throughout the opening ceremony. The contract included lighting of the flame and manning it 24 hours per day throughout the Olympic Games.

In 2011-2012 Maracom successfully tender its first design and build contract for a district heating system including CHP, boiler, ancillary plant and controls for a new build housing project in East London, at this time this was Maracom’s largest single plant room contract

Maracom competed in the Royal Warrant Holder 5 A side football competition, having reached the final Maracom lost on penalties

Maracom implemented a bespoke real time electronic reporting system; the system developed in-house facilitates real time reporting processes between Maracom’s management and admin team and our engineers as well as between Maracom and our clients.